Matt and I have been taking frequent trips over to the house for progress checks, but we’ve been careful not to go too often – a watched pot never boils (or however that saying goes).  So we did our usual swing by and then grab dinner on Wednesday after work and were pleased with the how things were going:

Progress Report | www.theartesianproject.wordpress.comNot bad, right?  The foundation was poured and cured, the basement framed, and the floor/ceiling joists were just getting started.

Then after Sunday brunch with my parents at one of our Logan Square go-tos, Lula Cafe (delish – sit at the bar and order a fancy coffee!), we drove over to the house.  HOLY COW was I thrilled with the progress!!  In just a matter of a few days the  basement/first level floor joists were completed as was the framing for the entire first floor – whoopie!  It was finally starting to take shape and look like a home.  There’s our front windows!  There’s the front door!  The fireplace will go right there!

Progress Report | www.theartesianproject.wordpress.com

IMG_5164So thar she blows!  Our contractor said the second floor and the roof are en route and ready to go, so we are (fingers crossed) on schedule!  Time to stop doing the happy dance and start making those decisions I have been putting off…  🙂

Mizzzz Penny Lane says:

https://theartesianproject.files.wordpress.com/2014/12/be89f-itsallhappening.gif

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s